Wastewater systems
(Section 2001.12.B and 8001.02.13)
We have updated our guide regarding the documentation required for wastewater systems. Previously AHFC accepted a copy of the Documentation of Construction stamped as “received” by DEC, which was acceptable.
AHFC will now accept one of the following items to confirm the system meets ADEC requirements:
• A copy of the State of Alaska Department of Environmental Conservation of Construction from a Civil Engineer (PE), a Board-Certified Environmental Engineer (BCEE), or a Certified Installer (CI);
• An inspection report from a Civil Engineer (PE), a Board-Certified Environmental Engineer (BCEE), confirming the system is functioning adequately AND meets ADEC regulatory requirements, or;
• An “Approval to Operate” issued and signed by ADEC, with the engineering design attached. The Approval to Operate is typically a letter from ADEC.
The Lender must ensure the system is suitable for the number of bedrooms in the property.
Second Mortgage Program
(Section 5008.04, PUR-84s)
The maximum loan amount for the Second Mortgage Program has been increased to $574,912.